About this property
Prime 0.89-acre development with two frontages on Peel and Sophia Street in downtown Barrie, offering a rare low-rise redevelopment opportunity just outside the city's Urban Growth Centre. Currently improved with four buildings containing nine income-producing rental units, the property generates immediate Yearly gross income of 170k to offset carrying costs during the planning and development process. Situated in a highly walkable location steps from shops, dining, transit, and Kempenfelt Bay's waterfront, the site is ideally positioned near the future Georgian College downtown hub at 55 Mulcaster Street and Lakehead University's new STEM Hub locations on Maple Avenue and Ross Street-both of which are expected to bring hundreds of students and staff into the core. With Barrie's population projected to approach 300,000 by 2051 and strong municipal support for intensification, this substantial land assembly is well suited for a purpose-built rental or condominium low-rise project, subject to approvals. (id:68078)
At a glance
- What’s on the land
- Building lot
- Frontage and depth
- 169 x 214 FT
- Property tax (estimate)
- $43,890 a year
- If you finance
- Rural lot (well and septic needed): lenders usually want 30–40% down
Full details
Neighbourhood
- Community
- City Centre
Utilities
- Utilities
- Sewer, Electricity, Cable
Land
- Frontage
- 169 ft
Details come from the listing brokerage through REALTOR.ca. Confirm anything important with them before you buy.
How far is it?
Open the map to see the distance and route from where you are.
Price history
- Nov 25, 2026, current price
- $3,990,000
Can this property be split?
A severance (the town calls it a consent) turns one property into two or more, each with its own deed. Groups use it so each owner can hold, build on or sell their own lot. Here's what it would cost in City of Barrie.How it works and how long it takes
- We check zoning, the official plan and minimum lot sizes, and tell you if a split is likely. About 10 business days.
- Pre-consultation with the town's planner, and a survey sketch of the new lots.
- We file the application with the town fees. The town posts a sign and notifies neighbours.
- The committee decides at a public hearing, usually 6 to 12 weeks after filing, followed by a 20-day appeal period.
- You meet the conditions, such as the reference plan, parkland payment and any road widening. Most towns allow up to 2 years.
- The town stamps the deeds and the lawyer registers each new lot.